The section of a building house sewer that a permit from the DEP is issued for is between the spur connection of the street sewer and the?

Prepare for the New York City Master Plumbers Exam. Enhance your skills with interactive flashcards and multiple-choice questions, each providing hints and explanations. Set yourself up for success!

The section of a building house sewer for which a permit from the Department of Environmental Protection (DEP) is issued runs from the spur connection of the street sewer to the lot line. This area is considered part of the public right-of-way, and the DEP regulates this section to ensure proper sewage management and compliance with local codes.

The lot line is significant because it defines the boundary between public and private property. Any work on the sewer line within this area requires oversight from the DEP to ensure that sewer systems are installed correctly and safely, protecting both public health and the environment.

When considering the other options, although the main building and the foundation line are related to the plumbing system, they refer to sections that are internal to the property and managed primarily by the building owner. The connection point could imply various locations where connections might occur, but it does not specifically define the extent of the sewer section requiring a DEP permit as robustly as the lot line does. Thus, the correct focus on the lot line highlights its role in delineating the regulated work area.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy